SP480

For all these types of machines the overhaul is total.

We insert a lot of optional that, very often, aren’t even present in new machinery, for example:

  • Total disassembly of injectors and mechanical part,
  • Replacement of the mould-holder columns and revision of toggle,
  • Replacement of PLC and PC inserting the latest software generation for control and monitoring of machine parameters,
  • Replacement of all hydraulic pipes and modification the hydraulic unit to insert the Energy Saving Vera® system.

Providing complete manuals in any language including CE certification (only in Europe) for the Safety Essentials Requirements (RES) of the Machinery Directive 2006/42/CE implemented in Italy with D.LGS. of 27 January 2010, n.17.

before

after

request information

Do not hesitate to contact us for any need.

Name(*):
Surname (*):
Company
Reason for contact
Nation
E-mail (*):
Phone/Mobile
Message (*)
Privacy Policy *
Read and Accepted